Saturday, March 14, 2009

Cut/drilled 2"x 0.125" angle iron for cage foundation along with a 2"x0.125" steel strip below the floorplan.

Finished front/middle hoops and tacked them to the angle.

Cut/fish -mouthed top tubes.

No comments: